Balfour Beatty built the track for an 8.5-mile addition to Metro’s light rail system through bustling downtown Los Angeles. Subsequent contracts maximized the network’s efficiency with new structures, stations and pedestrian improvements. Hop on board for a ride along one of the nation’s busiest rapid transit systems.

Balfour Beatty built the track for an 8.5-mile addition to Metro’s light rail system through bustling downtown Los Angeles. Subsequent contracts maximized the network’s efficiency with new structures, stations and pedestrian improvements. Hop on board for a ride along one of the nation’s busiest rapid transit systems.

Location
Los Angeles, CA
Client
Los Angeles Metropolitan Transit Authority (Metro)
Year Completed
2011
Sector
Rail
Value
$100M - $700M
Market Type
Transit
Services
Alternative Delivery, Design-build

As part of a team, Balfour Beatty was responsible for the design and construction of Phase 1 of the Exposition Line light rail transit (LRT) extension near Los Angeles, California. Balfour Beatty was responsible for the trackwork.

The new 8.5-mile addition to Metro’s rail system extended from an existing Metro rail station in downtown Los Angeles to a location near the intersection of Washington and National Boulevards in Culver City. The Expo Line shares track and two stations with the Metro Blue Line before diverging to travel along Exposition Boulevard. The Expo Line project included the design and construction of nine new stations along its route and two Park and Ride lots. Trees, shrubs and vines were planted along the corridor to create a park-like atmosphere.

Located, in Culver City, the full length of this 8.5-mile LRT line involved construction across major streets in central Los Angeles. Traffic management plans were developed, implemented and coordinated with city agencies, Caltrans, local businesses and communities. Safety of the work crews, traveling public and pedestrians was paramount, and the project was completed without a safety incident.

Subsequent projects completed along the Expo Line include the following: 

Expo C-5 Culver City Aerial Structure with Plaza, Culver City, California
Balfour Beatty served as the design-builder responsible for the design and construction of two 1,700-foot long aerial superstructures as well as the construction of the Venice/Robertson (Culver City) Aerial Station platform. The contract included plaza levels, all station fixtures and amenities and civil improvements in the surrounding areas.
Completed: 2012

Expo C-5 Contract Modification One: Venice Boulevard Underpass, Culver City, California
Balfour Beatty served as the design-builder for this contract modification to the original C-5 aerial structure contract. Balfour Beatty was responsible for the design and construction of the Venice Boulevard Underpass bridge superstructure and installation of major underground power and communication duct bank. The Venice Boulevard Underpass connects to the Culver City aerial station
Completed 2013 

C-6 Farmdale Station, Culver City, CA 
As the general contractor, Balfour Beatty constructed all communications, track and OCS work required for the C5 aerial station. The contract also included construction of Farmdale Station, street work, bike path, parking lots and all other infrastructure to support the Farmdale and Venice Stations. As part of this contract, Balfour Beatty installed 3,600-LF of track, OCS and communication system work. 
Completed: 2012